Projects

Mining

  • Substation maintenance West Cliff Colliery on 66kV ABB oil circuit breaker
  • Testing of HV and LV motors at Cadia Gold Mine
  • Maintain and perform switching Holcim Marulan Quarry
  • Holcim Quarry – HV Installation, Cable Termination and Commissioning (1 x 22kv Switchroom, 10 x  Padmount Transformer inc 9 x RMU’s)
  • Lynwood Quarry Marulan 22kV Network – 11 Cubicle Schneider SM6 switchgear and 10 Schneider pad-mount kiosk substations
  • Sada – Transformer Testing and replacement transformer tests
  • Boral Marulan Peppertree 33kV network – ABB Safe Ring switchgear and 6 ABB Pad-mount Kiosk Substations.

Data

  • Equinex Data Centre – Protection Grading and Commissioning of 6 Transformers and 4 Switchrooms, cable termination and testing of HV cabling
  • Gore Hill Data Centre Workshop assembly, Installation and Commissioning of 9 x 33kv Switchboards and Transformers
  • Metranode Data Centre – Workshop assemble, Installation and Commissioning of 4 x 33kv Switchboards and Transformers including all 33kv Cable Terminations
  • Gore Hill 33kV Network – Schneider CBGSO – 3 Substations and 3 Transformers
  • Metranode 33kV Network – Schneider CBGSO – 4 Substations and 4 transformers
  • Hewlet Packard – Installation and Testing of 8 x Air Transformers.

Education

  • University New South Wales Substation 5 – 11kV ABB safe ring – forward/reverse Directional protection scheme

Substations

  • Replacement of 120 x 1000kva transformers under warranty for ABB and Integral Energy
  • Termination and Jointing NRE Mine 33kv 630mm feeder from Endeavour Springhill Zone Substation (7 joint bays and 3 Ugos)
  • Endeavour Energy – The Oaks 33kv/11kv Substation Full Pre Commissioning, site installation + fitout and cable termination
  • Endeavour Energy Glenorie 33kv/11kv Substation full pre commissioning, Site installation and cable terminations
  • Endeavour Energy – Figtree Zone Substation HV (17 panel 11kv switchboard) Install and Pre-commission
  • Casula Zone Substation HV (27panel 11kv switchboard) Install and Pre-commission
  • South Windsor Zone Substation (12 panel 11kv switchboard) Install and Pre-commission
  • Nepean Zone Substation (23 panel 11kv switchboard) Install and Pre-commission
  • Huntingwood Zone Sub Station (38 panel 11kv Switchboard) Install and Pre – commission
  • East Richmond Zone Substation – Schneider 15 Cubicle HWX 2 installation and pre-commissioning
  • Nepean Zone Substation – Schneider 26 Cubicle HWX 2 installation and pre-commissioning.

Utilities

  • Generator and Switchroom installation at Hornsby WP0016
  • Relocation of HV/LV aerial and U/G network and 750kVA substation at Potts Hill Reservoir
  • Installation of 11kv aerial CCT ring Potts Hill Reservoir
  • Installation of 3.3kv auto transformer motor starter panels for Sydney Water Pennant Hills
  • Replace and Commissioning of 11kv Switchboard, installation and termination of new HV cabling at Cabramatta Pumping Station
  • Replace and Commissioning of 11kv Switchboard, installation and termination of new HV cabling at Fairfield Pumping Station
  • Replacement  of 33kv ABS switches Cordeaux Dam
  • Maintain and perform switching at various Sydney Catchment Authority and Sydney Water HV facilities.

Rail Network

  • Termination of 33kv cabling Strathfield and Concord.

Power Stations

  • Termination and testing of 6.6kv cabling at Tallawarra Power Station
  • Termination and Jointing of 11kv, 6.6 and 33kv cabling at Wallerawang Power Station.

Manufacturing

  • Installation of ABB Switchboard, Termination of HV Cables Allied Mills
  • Maintenance and operation of HV Switchyard.